Profiling Project Management

Creating a Profiling Project

  1. In the navigation tree on the left of the welcome page, click Projects, and select and open a built project.
  2. Choose Ascend > System Profiler > New Project on the menu bar or click in the upper left corner of the profiling report page.
  3. Repeat Step 3 to Step 6 to complete the creation.

Opening a Profiling Report Not Displayed

  1. In the navigation tree on the left of the welcome page, click Projects, and select and open a built project.
  2. Choose Ascend > System Profiler > Open... from the menu bar or click in the upper left corner of the profiling report display page to select the report that is not displayed.
  3. Click OK to open the report.

Opening a Report

After profile data collection is successfully executed, the profiling report is automatically opened and the profiling result is displayed as well.

  1. Right-click the corresponding report file in the navigation tree on the left of the report page.
  2. Choose Open Report from the shortcut menu.

Saving As

  1. Right-click the corresponding report file in the navigation tree on the left of the report page.
  2. Choose Save As from the shortcut menu.
  3. Select a destination path and click OK.
  4. If the dialog box shown in Figure 1 is displayed, the configuration is saved successfully. Click OK.
    Figure 1 Saving a report

Deleting a Report

  1. Right-click the corresponding report file in the navigation tree on the left of the report page.
  2. Choose Delete Report from the shortcut menu.
  3. In the dialog box shown in Figure 2, click YES.
    Figure 2 Deleting a report

Refreshing the Navigation Bar

Click in the upper left corner of the report page. This operation will refresh the navigation bar and all expanded projects will be collapsed.