Profiling Project Management
Creating a Profiling Project
Opening a Profiling Report Not Displayed
- In the navigation tree on the left of the welcome page, click Projects, and select and open a built project.
- Choose from the menu bar or click
in the upper left corner of the profiling report display page to select the report that is not displayed. - Click OK to open the report.
Opening a Report
After profile data collection is successfully executed, the profiling report is automatically opened and the profiling result is displayed as well.
- Right-click the corresponding report file in the navigation tree on the left of the report page.
- Choose Open Report from the shortcut menu.
Saving As
- Right-click the corresponding report file in the navigation tree on the left of the report page.
- Choose Save As from the shortcut menu.
- Select a destination path and click OK.
- If the dialog box shown in Figure 1 is displayed, the configuration is saved successfully. Click OK.
Deleting a Report
- Right-click the corresponding report file in the navigation tree on the left of the report page.
- Choose Delete Report from the shortcut menu.
- In the dialog box shown in Figure 2, click YES.
Refreshing the Navigation Bar
Click
in the upper left corner of the report page. This operation will refresh the navigation bar and all expanded projects will be collapsed.
Parent topic: Performance Analysis


