Before You Start

Prerequisites

Before using full NPU scheduling or static vNPU scheduling on the CLI, ensure that the following components have been installed. If they are not installed, refer to Installation and Deployment for further operations.
  • Volcano or other schedulers
  • Ascend Device Plugin
  • Ascend Docker Runtime
  • Ascend Operator
  • ClusterD
  • NodeD

Instructions

Full NPU scheduling or static vNPU scheduling:

Usage

Supported Products

Usage Process

For details about how to use full NPU scheduling or static vNPU scheduling on the CLI, see Figure 1.

The process of using Volcano through CLI is the same as that of using other schedulers. The main difference is that you need to create a job YAML file by referring to Use on the CLI (Other Schedulers) if you want to use another scheduler. The other operations of using another scheduler are the same as those of using Volcano. For details, see Use on the CLI (Volcano).

Figure 1 Usage process