The performance benefits of an MC2 operator stem from parallel execution of computation and communication. Specifically, the input data is tiled into multiple blocks. The computation and communication tasks of the blocks form two separate pipelines, which are executed in parallel to implement pipeline overlapping, thereby enhancing the operator's performance. As shown in the following figure, in the scenario where the MC2 operator performs Matmul computation and then communication, the input matrix is divided into two blocks along the M axis. The Matmul computation of the second block can be executed in parallel with the communication of the first block, thus saving time. In all figures in this section, MM indicates Matmul computing tasks, and hcom indicates communication tasks.

This case describes how to analyze the performance benefits of the MC² operator and how to formulate a proper data tiling strategy. For more complete samples of the MC2 operator, see MatmulAllReduce sample, MatmulReduceScatter sample, and AllGatherMatmul sample.

Obtaining Profile Data

Use the msProf tool to obtain the operator profile data.

Analyzing Main Bottlenecks

The performance benefit formula of an MC2 operator is as follows:

Serial execution time of operators before fusion = Execution time of the computation operator before fusion + Execution time of the communication operator before fusion

MC2 operator benefit = (Serial execution time of operators before fusion – Execution time of the MC2 operator after fusion)/Serial execution time of operators before fusion

The execution time of the MC2 operator is restricted by the following factors, which affect the operator performance benefits.

As analyzed above, the execution time of the computation and communication is relatively balanced, and pipeline overlapping and performance benefits are better. However, the performance benefits are also affected by the potential execution time expansion caused by data tiling. The following describes how to formulate a data tiling strategy to achieve the optimal pipeline overlapping effect.

Developing Optimization Solutions

Take the MatmulAllReduce operator of the Atlas A2 training product / Atlas A2 inference product as an example. The input data format is ND and the data type is half. In this operator, the computation task is performed before the communication task. Assume that the shape of the left matrix in Matmul is [M, K], the shape of the right matrix is [K, N], and the communication object in the operator is the output matrix of Matmul. In this case, the input shape of the communication task is [M, N]. Because the K axis exists only in Matmul computation, a longer K axis leads to increased computation workload, making computation time longer than communication time. In this case, computation is the operator bound (bottleneck). Conversely, when the K axis is short, the computation workload is small, and computation is faster than communication. In this case, communication becomes the operator bound. Before formulating a data tiling strategy, perform computation and communication tasks respectively on the original matrix, and identify the bound based on the execution time of the two tasks.

The data tiling strategy of the operator must meet the following requirements:

As described above, the objective of data tiling is to achieve as much pipeline overlapping as possible. Based on the execution time difference between computation and communication tasks, there are two specific scenarios, which have their own tiling objectives:

Preparations:

Before final data tiling, you need to identify the bound and fit the data size and execution time for Matmul computation and AllReduce communication. The procedure is as follows:

  1. Execute the Matmul computation and AllReduce communication tasks separately on the input data, use the msProf tool to collect the execution time, and identify the task with a longer time as the bound. For example, if communication takes longer than computation, the scenario is defined as communication bound.
  2. Tile the input data along the M axis into several data blocks whose M axis lengths are 256, 512, 768, 1024, and 2048. You can adjust the block sizes as required.
  3. Perform AllReduce communication on the data blocks obtained in step 2 and use the msProf tool to collect the execution time t1, t2, ..., tn of each data block. Then, analyze the relationship between the data size and execution time, and fit the result to obtain the formula t = CostComm(m). Specifically, m indicates the length of the M axis of the data block, t indicates the communication execution time of the data block, and CostComm indicates the mapping between m and t. Generally, the mapping is linear. If it is not linear, segmented fitting can be used. The following is an example.

    Data size: x = m * N * sizeof(dataType), in bytes. The fitting formula is as follows:

    • If x is less than 8 MB, t = –0.9698202 * x * x + 27.0622573 * x + 14.769, in μs.
    • If x is greater than or equal to 8 MB, t = 13.58491263 * x + 61.508333, in μs.
  4. Perform Matmul computation on each data block obtained in step 2, collect the computation execution time t of each data block in the same way as in step 3, and fit the formula t = CostMM(m) for the mapping between the M axis length (m) and the computation execution time (t).

Tiling algorithm steps:

  1. Set the proper short block length in the M-axis direction based on the shapes (M, K, and N values) of the input matrices. In the following expressions, a, b, and c indicate the alternative short block lengths based on empirical values. After K and N are substituted into the following three expressions, the minimum value among a, b, and c is used as the selected short block length (m0).
    • a * K * N ≥ 4 * 1024 * 1024 * 1024, where you need to find the smallest a that satisfies the inequality
    • b * K * N / 1024 + b * N ≥ 6 * 1024 * 1024, where you need to find the smallest b that satisfies the inequality
    • c ≥ 3 * 128, where you need to find the smallest c that satisfies the inequality
    • m0 = min(a, b, c)
  2. Based on the short block length m0 and the fitting formula, the computation execution time t0 = CostMM(m0) * 1.15 and the communication execution time t1 = CostComm(m0) * 1.15 are obtained.

    Note: When communication and computation are executed in parallel, memory bandwidth preemption may occur, prolonging the execution time. Generally, the factor 1.15 is multiplied by the fitting formula based on empirical values. You can adjust the factor as required.

  3. Based on the length of the short block, balance the communication and computation according to Figure 1 or Figure 2 to obtain the length of the long block. Align the length of the long block with 128 elements to ensure computation affinity. This case is a communication bound scenario. The balancing here is to equalize the communication time of the short block with the computation time of the long block. Use t1 as the computation execution time of the long block and substitute it into the formula t1 = CostMM(m1) to calculate m1, which is the length of the long block.
  4. Calculate the number of long blocks by using count = (M – m0)/m1, where m0 indicates the length of the short block, m1 indicates the length of the long block, and M indicates the original M-axis length. Generally, the formula cannot be exactly divided, so the following operations are required:
    • Discard the decimal part of the result and retain the integer part as the number of blocks.
    • Because the decimal part is discarded, the M-axis length has a remainder. Therefore, you need to adjust the length of the long block, that is, m1 = (M – m0)/count.
    • To ensure computation affinity, align m1 down to the nearest integer multiple of 128, which yields the updated result of m1.
    • After m1 is adjusted, the M-axis length still has a remainder. Therefore, adjust the length of the short block, that is, m0 = M – (m1 * count).
    • The final results of m0, m1, and count are obtained.

Verifying Optimization Benefits

Summary

The MC2 operator obtains performance benefits by parallel execution of computation and communication after data tiling. However, the performance benefits are affected by the execution time expansion after data tiling. The main method of performance optimization for the MC2 operator is to formulate a data tiling strategy based on theoretical derivation, and then adjust the strategy based on the measured results to find the optimal tiling strategy.